Advertisement

Rulebook changelog

Building rules change: cycles move, new ordinances pass, deadlines shift. We track every change we find against official sources, dated, and keep the history public. The same feed powers deadline tracking for every building on Certmill.

New York City2026-10-19

Parking structure inspection penalties added: late filing $1,000 per month, failure to file $5,000 per year, failure to correct unsafe conditions $1,000 per month, and a $2,000 one-time penalty for failure to correct SREM conditions (NYC DOB Parking Structure Fees & Penalties).

San Francisco, CA2026-10-19

Penalty data added for the boiler Permit to Operate program: operating on an expired PTO requires paying a $1,305 penalty before the permit can be renewed (SF DBI).

Illinois2026-10-19

Statute citation corrected to the Elevator Safety and Regulation Act (225 ILCS 312, P.A. 92-0873) - the previously cited 420 ILCS 45 is repealed. The State Fire Marshal also confirmed the proposed amendments to the elevator administrative rules (41 Ill. Admin. Code 1000) were withdrawn Feb 6, 2026, so no rule changes are pending.

Washington2026-10-19

Boiler program: L&I and the Board of Boiler Rules adopted amendments to WAC 296-104 affecting definitions, program fees, and inspection/operation/maintenance requirements (rulemaking AO25-27). Final adoption Sep 1, 2026; effective Oct 2, 2026.

Miami-Dade County, FL2026-10-12

Building recertification threshold confirmed at 30 years (25 years for coastal buildings), then every 10 years — reduced from the old 40-year cycle under Code sec 8-11(f). Owners get 90 days from notice to file the sealed structural and electrical report.

Broward County, FL2026-10-12

Building Safety Inspection Program (BSIP) threshold lowered from 40 to 25 years, with re-inspection every 10 years, under the 2024 program update by the Broward Board of Rules and Appeals. 180 days from notice to submit reports.

Illinois2026-10-12

Penalty data added for boiler and pressure vessel inspections: operating without a valid inspection certificate is a petty offense with each day a separate offense; accident non-notification fines run $501 to $10,000 for corporations (430 ILCS 75/12).

San Diego, CA2026-10-12

Penalty data added for annual backflow testing: non-compliance brings code enforcement action, including fines and water service termination until compliance.

Texas2026-10-05

TDLR Late Inspection Fees took effect June 15, 2026 for overdue boiler inspections (16 TAC 65.61): $25/day for 0-30 days late, $50/day for 31-60 days, $100/day for 61+ days, accruing daily until the inspection is completed.

Oklahoma City2026-10-05

Oklahoma City updated its elevator safety standards to align with the state program: ASME A17.3-2023 enforced for existing elevators from January 1, 2026 (ascending car overspeed and unintended movement protections deferred to January 1, 2030); ASME A17.1-2022 and A18.1-2023 required for new-installation and alteration permits filed on or after July 1, 2026.

Maryland2026-10-05

Maryland adopted updated elevator safety codes effective June 17, 2026: ASME A17.1-2022 (Safety Code for Elevators and Escalators) and ASME A18.1-2023 (Platform Lifts and Stairway Chairlifts).

Washington2026-10-05

The City of Spokane transferred its boiler inspection program to Washington State L&I effective July 1, 2026; Spokane boilers are now handled under the state Boiler Section like the rest of the state.

New York City2026-10-05

Penalty data added from official sources: drinking water tank failure to inspect/file the annual report runs $500 first violation / $1,000 subsequent (NYC Health Code 141.07 penalty schedule); backflow annual test report failures run $500-$1,000, and operating without a required backflow device up to $2,000 (NYC DEP).

Georgia2026-10-05

Penalty data added for elevator requirements from the official rule text: civil penalties up to $5,000 per violation and per day of continuing violation, with graduated minimum recommended penalties (GA R&R 120-3-25-.11).

Pennsylvania2026-09-28

Elevator code adoption: ASME A17.1-2016 (Regulation #12-123) effective December 20, 2026, replacing A17.1-2000. Annual CAT1 testing for hydraulic/traction elevators and escalators phases in with the next routine inspection after the effective date.

Pennsylvania2026-09-28

Source URL repaired: DLI boiler program page moved during pa.gov restructure; now cites the live BOIS boilers and unfired pressure vessels page.

Los Angeles2026-09-28

Source URL repaired: EBEWE row now cites the live LADBS Existing Buildings Energy and Water Efficiency program page instead of a dead 2022 deadline-extension PDF.

New York City2026-09-28

New Legionella sampling cadence in effect May 8, 2026: cooling tower owners must test monthly, with no more than 31 days between samples (NYC Health Department amended rules).

Multi-jurisdiction2026-09-28

Penalty data added to 8 rows from official sources: Texas elevator (TDLR administrative penalties + $10/30-day late filing), Florida elevator ($50 late fee after Aug 1), Arizona elevator + boiler (cease-and-desist, no monetary penalties), California balconies ($100-$500/day, HSC 17973), Nevada elevator + boiler (NRS 455C.150 administrative fines), Denver elevator permit (DMC 1-13 per-day offenses).

New York City2026-09-26

Cooling tower certifications moved to twice yearly (January and July) under 2025 state legislation (S08472-A). Penalties for violations now reach $7,000 for repeat offenses.

Boston, Philadelphia + 8 cities2026-09-26

Added facade inspection ordinances for Boston (sec 9-9.12, $300/day for non-compliance), Philadelphia, Jersey City, Cincinnati, Cleveland, Columbus, Detroit, Milwaukee, Pittsburgh, and St. Louis.

Florida2026-09-26

Added Florida coverage: elevator certifications (ch. 399), Miami-Dade BE305 benchmarking, Miami-Dade 40-year recertification, Tampa backflow testing, and Broward County 40-year recertification.

All jurisdictions2026-09-26

Penalty data added to requirement rows: what missing a deadline costs, with the official source. Future-dated rules now show a 'takes effect' countdown before they become enforceable.

Track my buildings
Advertisement