Regulated by Washington Labor & Industries (L&I). 2 cert types in the database.
All regulated conveyances (elevators, escalators, platform lifts) installed in Washington State
RCW 70.87; WAC 296-96
Owners of regulated boilers, unfired pressure vessels, and water heaters in Washington State
RCW 70.79; WAC 296-104
Certmill's database lists 2 requirement types for Washington, including elevator program wa, boiler program wa. Every rule cites the official agency page, and cities inherit their state's requirements automatically.
All regulated conveyances (elevators, escalators, platform lifts) installed in Washington State The required cycle is annual operating permit under RCW 70.87; WAC 296-96, administered by Washington L&I Elevator Program.
Owners of regulated boilers, unfired pressure vessels, and water heaters in Washington State The required cycle is annual by type under RCW 70.79; WAC 296-104, administered by Washington L&I Boiler Section.
Check the requirement cards on this page: any facade or exterior wall rule shows its trigger (usually a story or height threshold), cycle, and the official ordinance source. Certmill adds facade requirements automatically for buildings of 7 or more floors.
Add the building in Certmill, pick Washington, and check the equipment you run. The requirements expand into a deadline calendar with countdowns, 60-day alerts, and an evidence binder PDF.